Washington D.C. 15 December,
2007 HA Design Completed the
Low Voltage Design for the new ZDF
TV Bureau.
Lexington, Va. 20 September,
2007 HA Design Upgrades the
facility for the Washington and Lee
University Journalism School
Facility.
Washington, D.C. 1 September, 2007
HA Design Finishes the Design and
Project Management for the
implementation of the Subtitling
system for The Voice of America.
............ more
Washington, D.C. - 1
July, 2007 HA Design Group was
awarded the contract for Consulting,
Design, and Project Management on
several projects for VOA TV.
............
more
Washington, D.C. - 15 June,
2007 HA Design Group was
awarded the contract for consulting
services to National Public Radio.
|
|
HA Design Group's engineers
have been leading the industry since 1994 to develop and design equipment,
software and systems that provide technically advanced system
that are both reliable and versatile. There have been a number of firsts for the engineers at HA
Design.
ALL Digital
Television and Radio Facility
Digital HDTV System (DTV Express*)
HDTV Master Control
on the Air (WRAL)
HDTV Television
Facility (WTVI)
Facility Dolby E
Implementation (WTVI)
IT Server
Based Video Broadcast System (MBN)
HA
Design Group LLC is a Leading Edge Technology Engineering Design Group.
* DTV Express is a registered trademark of Harris
Corporation |